Star Sonata
http://www.starsonata.com/forum/

Shorten the build time on ENIACS
http://www.starsonata.com/forum/viewtopic.php?f=104&t=50575
Page 1 of 1

Author:  Camsy [ Sat Feb 18, 2012 9:25 pm ]
Post subject:  Shorten the build time on ENIACS

I hear about the uni reset on the day its announced, I already have 2 eniac ultra scanners built. First I cant build the fucking omega scanner cause it takes 2.5 bloody weeks to build. Then termites kill my base and I drop the eniac ultra scanner. Which takes 7 days to build. Now I gotta go and buy all the effing bps again which costs like 4b total. FUUUUUU!

So basically my idea is drop build time on eniacs so that the entire scanner can be build within 2 weeks.

Author:  andezrhode3 [ Sat Feb 18, 2012 9:45 pm ]
Post subject:  Re: Shorten the build time on ENIACS

Sorry mate, hate to kill your buzz, but;
ENIACs are top of the range, shit thats one build, several use, ergo, it should take over two weeks.
Shit like kits, one use, one uni, under 2w, grand. This lasts a long time, and [lol] was intended as a larger project.

Author:  Visorak [ Sun Feb 19, 2012 9:24 am ]
Post subject:  Re: Shorten the build time on ENIACS

What happened to the thread asking for all build times to be one week maximum? Or does that not apply to a build with more than one stage?

Author:  Madridista [ Sun Feb 19, 2012 11:13 pm ]
Post subject:  Re: Shorten the build time on ENIACS

Camsy wrote:
hey guys i noobed out for a sec and lost shit so can we please make it shorter i hate waiting.

Author:  Camsy [ Mon Feb 20, 2012 12:54 am ]
Post subject:  Re: Shorten the build time on ENIACS

Madridista wrote:
Camsy wrote:
hey guys i noobed out for a sec and lost shit so can we please make it shorter i hate waiting.

This :) ^

Author:  SerjicalStrike [ Mon Feb 20, 2012 7:30 am ]
Post subject:  Re: Shorten the build time on ENIACS

Nothing should take longer than it takes to announce universe reset.

Author:  Belliaum [ Mon Feb 20, 2012 11:41 am ]
Post subject:  Re: Shorten the build time on ENIACS

SerjicalStrike wrote:
Nothing should take longer than it takes to announce universe reset.


The true issue here is the fact that universes are announced way to close to the new uni. We should get a months notice for the reset.

Author:  sleepysnagrund [ Mon Feb 20, 2012 12:14 pm ]
Post subject:  Re: Shorten the build time on ENIACS

It was my impression that the goal was to have each stage take no more than a week. So, to build an ENIAC from scratch could take more than 1 week, but to build each stage should not.

Author:  Belliaum [ Wed Feb 22, 2012 9:04 am ]
Post subject:  Re: Shorten the build time on ENIACS

The problem seems to be that he already equipped the BPs which is kinda fail.

Author:  Battlecruiser23 [ Wed Feb 22, 2012 10:47 am ]
Post subject:  Re: Shorten the build time on ENIACS

Belliaum wrote:
The problem seems to be that he already equipped the BPs which is kinda fail.


True that.

If you equipped a bp or started a build that WONT survive to finish by reset, you deserved to lose the material used.

Author:  Precursor [ Sun May 06, 2012 8:51 pm ]
Post subject:  Re: Shorten the build time on ENIACS

Don't see it being reduced really. If you plan on needing a ENIAC then plan and build in advance appropriately.

Page 1 of 1 All times are UTC - 5 hours
Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group
http://www.phpbb.com/